Project Details

Owner: Alameda Corridor Transportation Authority

Contract value: $82,300,000

Description

Locatred in the City of Industry and the Route 60 freeway, the Fullerton Road Grade Separation is a complex 5-stage project with 19 phases of construction. The project involves over 14,000 feet of railroad track construction, over 10,000 feet of retaining wall construction, 3 bridges structures (UPRR, roadway, and pedestrian), as well as extensive deep (20-35ft) sewer and storm drain construction with dewatering measures.