Project Details

Owner: DPR-OCPC Irvine Campus Phase

Contract value: $20,000,000

Description

The OCPC Campus Bridges project is a design-build project being constructed to connect both sides of the new OCPC office campus across the future Marine Way. The North Bridge is a cast-in-place concrete box girder bridge providing vehicular connection to both sides of the campus. The larger Plaza Deck is a cast-in-place concrete slab bridge supporting the future park spanning over Marine Way, providing pedestrian access between buildings. Unique features of this design/build project include innovative fire protection through the inclusion of polypropylene fibers in the concrete to mitigate potential fire damage to the Plaza Deck structure. Both bridges are being designed and constructed to CalTrans standards.