Owner: Catellus Urban Construction, Inc.

Contract value: $4,613,876

Description

The project was located near AT&T Park in the Mission Bay Development in San Francisco. The project’s purpose was to filter and deliver storm water runoff from future development in the Mission Bay Community to San Francisco Bay via China Basin Channel. The project included construction of a new Continuous Deflective Separation (CDS) Stormwater Treatment Unit which filters oil and debris from the storm water before sending it into a concrete pump station with eight 14-in stormwater pumps and two 4-in dry weather pumps.

The new pump station feeds into China Basin Channel at a new concrete outfall structure through eight 12-in ductile iron pipes. The pump station is controlled and operated from a new on-site control building.