Headquarters
Headquarters
National
Northwest
Southwest
O&M
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 10276 NW 47th Street Sunrise, FL 33351
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

Caltrain Station Pedestrian Underpass

Home > Markets > Transportation > Caltrain Station Pedestrian Underpass

Caltrain Station Pedestrian Underpass

Shimmick constructed a new pedestrian tunnel to access the Santa Clara Caltrain Station from Brokaw Road and connect to the future BART station. The project scope included 5,000 cubic yards of excavation, installing 80 feet of precast concrete tunnel, and 225 feet of cast-in-place concrete ramp and retaining walls. Shimmick also self-performed the required electrical work for the project.

Project Details

Location:Oakland, CA
Amount: $5M
Delivery Method:Bid-Build
Client Name:Santa Clara Valley Transportation Authority
Duration: 2016-2017