Headquarters
Headquarters
National
Northwest
Southwest
O&M
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 10276 NW 47th Street Sunrise, FL 33351
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

News

Location
Mosquito Bridge project for the El Dorado County Department of Transportation in Camino, CA

Mosquito Road Bridge

/
The Mosquito Road Bridge project consist of the construction of a 1,200-foot long cast in place cantilever bridge for the County of El Dorado.

Miramar Reservoir Pump Station Improvement Project – K-22-2058-DBB-3

/
The project consists of improvements to the existing 100-million gallon per day (MGD) Miramar Reservoir Pump Station.

P1-133 Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1

This project is located at Plant No. 1 and the P1-133 portion, replaces the primary influent splitter box launders, replaces primary sludge pumps and VFDs, and installs a foul air sump pump.
P1-133 Primary Sedimentation Basins No. 6-31 Reliability Improvements_basin building construction in Huntington Beach, California.

Lopez Drive Bridge Seismic Retrofit

/
The Lopez Drive bridge seismic retrofit is a structural rehabilitation of the existing Lopez drive bridge pier footings.

El Cajon Third Track Project

The El Cajon Third Track Project will extend an existing station platform, add 480 feet of new track including a new turnout as well as realign existing track.

Curtain Wall Repairs and Backfilling at B Street Pier

The Curtain Wall Repairs and Storm water Improvements at B Street Pier Project is a structural rehabilitation and storm water infrastructure upgrade for the Port of San Diego’s B Street Pier.

LA-405 at San Gabriel River Bridge

/
The team will construct pier footing extensions for Pier 3 and Pier 4 in the San Gabriel River on three bridges on Route 405.

Long Beach MUST Facility Phase 1

The Long Beach Municipal Urban Stormwater Treatment (MUST) Facility project constructs the stormwater treatment facility that will be used to treat stormwater runoff and produce recycled water for beneficial reuse.

LAX Automated People Mover Project

/
Legacy Foundations (a division of Shimmick) drilled over 26,000 linear feet, installed around 12 million pounds of reinforced steel, and placed over 36,000 cubic yards of concrete across more than 400 CIDH shafts.
1 2 3 13