Headquarters
Headquarters
National
Northwest
Southwest
O&M
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 10276 NW 47th Street Sunrise, FL 33351
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

BART Warm Springs Extension Access Bridge and Plaza

Home > Markets > Mass Transit and Rail > BART Warm Springs Extension Access Bridge and Plaza

BART Warm Springs Extension Access Bridge and Plaza

This project consisted of the construction of a two span (a 144 ft. long truss span and a 102 ft. long cable-stay span) pedestrian and bicycle bridge connecting to the west side of the new Warm Springs/South Fremont BART station, the bridge vertical circulation elements (staircase, escalators with canopy, and elevator), installation of plumbing, lighting, security, and communications systems to support the operation of the bridge.

Shimmick also constructed of various rooms, with required appurtenances, within the staircase and escalator buildings, including a janitor/storage room, a valve room, a communications room, an electrical room, a battery room, an elevator machine room, an escalator control room, a mechanical space, and a trash area. The project also included construction of an approximately one acre City Plaza for the landing place of the bridge vertical elements.

The City Plaza included decorative pavement, terraced seating and benches, lighting elements, storm water treatment areas, landscaping, irrigation, utility connections, fences, bicycle lockers, solar charging stations, an information kiosk, and a retaining wall and fence along the eastern edge of the project.

Project Details

Location:Fremont, CA
Amount: $23M
Delivery Method:Bid-Build
Client Name:City of Fremont
Duration: 2018-2020