Headquarters
Headquarters
National
Northwest
Southwest
O&M
MEP
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 10276 NW 47th Street Sunrise, FL 33351
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

News

Home > News

ARCHIVE

Legacy Foundations has recently set a new company record on the I-405 Freeway Improvements design-build, drilling a 12-foot-diameter, 201-foot-deep CIDH shaft with a cage weighing more than 365,000 pounds. A two-pump pour allowed Legacy to place 767 CY of concrete while extracting temporary sectional casing and transferring the rebar cage load from crane, to oscillator,...
Continue Reading
Shimmick’s Cowlitz Falls Barrier Dam Repair project team has wrapped up their first season of in-water work and is well underway with preparation of the second in-water season, starting in July. The project entails inspection, repair, and reconstruction of the weir dam and apron slab, which was damaged due to the weir’s shape and subsequent...
Continue Reading
In December, the CFX project team reached 5 million hours—more than 10 years—without a lost-time injury or incident. The project operates out of 14 locations, with approximately 70 total lanes running per day. The team of 280-plus employees must maintain operations 24 hours a day, seven days a week—a schedule that requires lane crossings approximately...
Continue Reading
Shimmick is a proud member of Waterways Council, Inc., supporting the council's essential inland waterways mission to serve the Corps and local communities. Recently, we were featured in WCI's Capitol Currents Newsletter, which highlighted our extensive inland waterway work. 
Continue Reading
After more than four years of work, the 25th Avenue Grade Separation project for owner Peninsula Corridor Joint Powers Board/Caltrain is reaching completion. The project involves multiple work scopes, including raising two miles of track (max of 24 feet) onto new MSE walls and bridges, building three traffic grade-crossings beneath the tracks, and building a...
Continue Reading
On December 9, Bayer Quarry reached a monumental safety milestone—28 years without lost-time accident. This long-term project has deep roots in our legacy company history, dating back to our time as Washington Construction, and has been a part of numerous legacy company changes over the years.
Continue Reading
Last month, Central Florida Expressway (CFX) Toll Operations Project commemorated Customer Service Week by celebrating five “shining star” field employees, nominated by plaza managers for their outstanding customer service. Congrats to these award recipients and thanks to all you do for Shimmick and our customers! 
Continue Reading
Legacy Foundations’ Mitigation Department has completed a mitigation repair project to repair three 36-inch diameter piles on the Cottonwood Creek Bridge Replacement Project for Tulare County within a highly condensed timeline.
Continue Reading
The $356 million new North City Pure Water Facility and North City Pure Water Pump Station projects are part of the first phase of the City of San Diego’s Pure Water Program, designed to produce high-quality purified water for San Diegans while reducing their dependence on imported water.
Continue Reading
Legacy Foundations is working closely with GC OHL on the $49.3 million Hamner Avenue Bridge Replacement project in Norco, CA over the Santa Anna River. The team is using a blend of oscillator/crane clam shell excavation and conventional drill rig drilling to drill 33 CIDH shafts in the extremely environmentally-sensitive flood plain.
Continue Reading