Headquarters
Headquarters
National
Northwest
Southwest
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

Folsom Dam

Home > Markets > Water Resources > Folsom Dam

Folsom Dam

The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley.

The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, “top seal”  structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. 

Also, key is the Left and Right Wing Dams work which includes the construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam.

Project Details

Location:Folsom, CA
Amount:$114M
Client Name:USACE
Duration:2023-2026