Foster City Levee Improvements

Home > Markets > Water Resources > Foster City Levee Improvements

Foster City Levee Improvements

This $60 million project consists of a series of flood protection improvements, including steel sheet pile, and concrete floodwalls adjacent to San Francisco Bay, Belmont Slough, and O’Neill Slough along the existing levee and floodwall alignments; the construction of concrete and mechanically stabilized earth retaining walls; embankment construction using earth fill and lightweight cellular concrete fill; design-build bridge structures for pedestrians and vehicles; paving with asphalt concrete and decomposed granite surfaces; ornamental and mitigation landscaping with irrigation; and the installation of recreational amenities along the San Francisco Bay Trail. The total project length is approximately 6.5 miles. The project is located adjacent to environmentally sensitive Bay and marsh environments and is subject to tidal flooding.

Project Details

Location:Foster City, CA
Amount: $60.2M
Delivery Method:Bid-Build
Client Name:City of Foster City
Duration: 2020-2023