Headquarters
Headquarters
National
Northwest
Southwest
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

Natomas Mutual Water Company Riverside Pumping Plant Replacement

Home > Markets > Water Resources > Natomas Mutual Water Company Riverside Pumping Plant Replacement

Natomas Mutual Water Company Riverside Pumping Plant Replacement

Project Work Includes: Select demolition of the existing pumping plant structure, including structural, mechanical, and electrical components; the existing Pump House will remain in place; A new pump support structure founded on steel pipe piles; An access road from Garden Highway to the pumping plant facility; A fish screen unit with integral brush cleaning system and retrieval system; A log boom located in the Sacramento River; One mixed flow irrigation pump, with adjustable frequency drive, and motor; Discharge piping extending from the new pump to an aboveground flowmeter located adjacent to the existing Pump House and connecting to existing discharge piping through the levee; replacement of piping up-and-over the levee is by others (future work); Electrical, controls, and lighting for the pumping plant facility; Miscellaneous auxiliary equipment and Site improvements.

Project Details

Location:Sacramento, CA
Amount: $8M
Client Name:Natomas Mutual Water Company
Duration: 2023-2024