Headquarters
Headquarters
National
Northwest
Southwest
O&M
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 10276 NW 47th Street Sunrise, FL 33351
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

OCPC Irvine Campus Phase 1

Home > Markets > Transportation > OCPC Irvine Campus Phase 1

OCPC Irvine Campus Phase 1

The OCPC Campus Bridges project is being constructed to connect both sides of the new OCPC office campus across the future Marine Way. The North Bridge is a cast-in-place concrete box girder bridge providing vehicular connection to both sides of the campus. The larger Plaza Deck is a cast-in-place concrete slab bridge supporting the future park spanning over Marine Way, providing pedestrian access between buildings. Unique features of this project include innovative fire protection through the inclusion of polypropylene fibers in the concrete to mitigate potential fire damage to the Plaza Deck structure. Both bridges were designed and constructed to Caltrans standards.

Project Details

Location:Irvine, CA
Amount: $20M
Delivery Method:Bid-Build (Subcontract)
Client Name:DPR Construction
Duration: 2015-2017