Headquarters
Headquarters
National
Northwest
Southwest
O&M
Electrical
Legacy Foundations
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 7601 Technology Way Suite 100 Denver, CO 80237
833-723-2021 1 Harbor Center, Suite 200 Suisun City, CA 94585
833-723-2021 530 Technology Dr, Suite 300, Irvine, CA 92618
833-723-2021 10276 NW 47th Street Sunrise, FL 33351
833-723-2021 530 Technology Dr Irvine, CA 92618
833-723-2021 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

Outfall Low Flow Pump Station

Home > Markets > Water/Wastewater Treatment > Outfall Low Flow Pump Station

Outfall Low Flow Pump Station

The project includes construction of a new joint outfall low flow pump station facility and rehabilitation of the existing ocean outfall booster station, central power generation building, effluent pump station annex, and standby power facility to repair and improve the reliability and efficiency of the existing ocean outfall system.

This project also includes the rehabilitation of the existing electrical distribution systems throughout OCSD’s Plant 2. Among other minor upgrades, a new 2-megawatt diesel standby generator will be added to the existing EPSA, which currently houses four existing generators.

Shimmick is currently self-performing approximately 85 percent of the work, including excavation, CIP concrete and concrete formwork, water bearing concrete structures, PVC lining, industrial Epoxy Coatings,

Additional work includes 36-to-96-inch steel pipe, yard and process piping and process piping, metering pumps, automatic strainers, turbine and column pumps, and other electrical equipment. Shimmick self-performed installation, testing and commissioning.

Project Details

Location:Huntington Beach, CA
Amount: $90.2M
Delivery Method:Bid-Build
Client Name:Orange County Sanitation District
Duration: 2019-2024