Headquarters
Headquarters
National
Northwest
Southwest
O&M
MEP
Legacy Foundations
510-777-5000 8201 Edgewater Drive Suite 202 Oakland, CA 94621
303-694-2770 7601 Technology Way Suite 100 Denver, CO 80237
707-759-6858 1 Harbor Center, Suite 200 Suisun City, CA 94585
949-333-1500 530 Technology Dr Irvine, CA 92618
954-350-1232 10276 NW 47th Street Sunrise, FL 33351
949-333-1500 530 Technology Dr Irvine, CA 92618
949-333-1500 530 Technology Dr Irvine, CA 92618
MAKE IT HAPPEN.

P2-123 Return Activated Sludge Piping Replacement

Home > Markets > Water/Wastewater Treatment > P2-123 Return Activated Sludge Piping Replacement

P2-123 Return Activated Sludge Piping Replacement

Shimmick is removing and replacing approximately 1,400 linear feet of the deteriorated Returned Activated Sludge piping, valves, valve actuators and associated wiring, flexible couplings, and pipe supports; and installing twelve new 14-inch isolation valves. 

Additionally, Shimmick is performing concrete repairs through full penetration cracking by drilling through the defect, and injecting expanding polyurethane to fill the voids. Additional work includes replacing existing light poles at the activated sludge basin and secondary clarifiers.

Project Details

Location:Huntington Beach, CA
Amount: $6M
Delivery Method:Bid-Build
Client Name:Orange County Sanitation District
Duration: 2019-2021