Archive

[rev_slider alias="Rapid-Disaster-Infrastructure" slidertitle="Rapid Disaster Infrastructure"][/rev_slider] Rapid Disaster Infrastructure and Levee Repair Shimmick constructed part of a new levee system in Rock Port, Missouri under the USACE’s Rapid Disaster Infrastructure program. Shimmick repaired damage to the Missouri River Levee System L-536 under a task order for a multiple...

[rev_slider alias="San-Vicente-Dam-Raise-Project-Construction-Package-3" slidertitle="San Vicente Dam Raise Project Construction Package 3"][/rev_slider] San Vicente Dam Raise The San Vicente Dam Raise was part of the Emergency Storage Project, a system of reservoirs, interconnected pipelines, and pumping stations designed to make water available to the San Diego region in the...

[rev_slider alias="Silverlake-Reservoir-Replacement-Project--Phase-II-Headworks-West-Reservoir" slidertitle="Silverlake Reservoir Replacement Project – Phase II Headworks West Reservoir"][/rev_slider] Silverlake Reservoir Phase II Headworks Shimmick constructed the new Headworks Reservoir West structure utilizing mass concrete batched onsite at our batch plant. The project included the importation of approximately 47,000 cubic yards of permeable base...

[rev_slider alias="Knights-Landing-Bridge-Replacement" slidertitle="Natomas Mutual Water Company-Riverside Pumping Plant Replacement"][/rev_slider] Natomas Mutual Water Company Riverside Pumping Plant Replacement Project Work Includes: Select demolition of the existing pumping plant structure, including structural, mechanical, and electrical components; the existing Pump House will remain in place; A new pump support structure...

[rev_slider alias="Haster-Retarding-Basin-Pump-Station-and-Recreational-Field" slidertitle="Haster Retarding Basin Pump Station and Recreational Field"][/rev_slider] Haster Retarding Basin Pump Station The Haster Pump Station, Retarding Basin and Recreational Field Project is an integrated flood control project and recreational use area incorporating a two-acre soccer field, three-quarter-mile jogging path, 11 exercise stations, and...

[rev_slider alias="Sweeney-McCune-Creek-Outflow-Recovery--Automation" slidertitle="Sweeney-McCune Creek Outflow Recovery & Automation"][/rev_slider] Sweeney-McCune Creek Outflow Recovery & Automation This project included installing a concrete weir structure at the confluence of the Sweeney and McCune Channels to recapture agricultural irrigation water. The structure included eight (8) feet tall tapered weir walls above...

[rev_slider alias="sunset-reservoir-north-basin-seismic-retrofit-1" slidertitle="Sunset Reservoir North Basin Seismic Retrofit 1"][/rev_slider] Sunset Reservoir North Basin Seismic Retrofit This project was the second part of a two-part project that addressed the seismic readiness condition of the Sunset Reservoir. The Sunset Reservoir provides 60 percent of the clean water supply for...

[rev_slider alias="Stony-Gorge-Dam-Modification" slidertitle="Stony Gorge Dam Modification"][/rev_slider] Stony Gorge Dam Modification The original Stony Gorge Dam was completed in 1928 and is a reinforced concrete Ambursen type dam with a concrete slab and buttress. The existing dam had a 868-foot-long crest with a structural height of 139 feet. To...

[rev_slider alias="Ponderosa-Tunnel-Project" slidertitle="Ponderosa Tunnel Project"][/rev_slider] Ponderosa Tunnel Project This project involved the placement of a partially reinforced concrete floor to facilitate foot traffic and light equipment within the tunnel, as well as the removal of approximately 20-30 cubic yards of log debris that had collected at the...

[rev_slider alias="Mountain-Tunnel" slidertitle="Mountain Tunnel"][/rev_slider] Mountain Tunnel This project improved Adit 5/6 and Adit 8/9 access roads by grading and resurfacing the road with crushed rock. It enlarged Adit 5/6 and Adit 8/9 openings by replacing 3-foot diameter bulkheads with new 8-foot by 8-foot bulkhead doors. Enlarging the...